A dairy food processor added a brine conveyance system inside this warehouse. The old roof had to come off and a new one go on to keep the new equipment dry.
What we did
Removed the old mechanically attached TPO and slip sheet.
Kept the existing rigid insulation and steel deck in place.
Installed a new slip sheet and mechanically attached Carlisle 60 mil TPO.
Final walk and close-out with the owner.
Working around a food plant
Trucks and forklifts moving below all day
Built to weatherproof a new brine conveyance system
Membrane and slip sheet replaced over the existing insulation and steel deck
Photos
On site.
Drone photos from the job. Client logos are blurred.